{"id":269,"date":"2026-09-29T11:23:42","date_gmt":"2026-09-29T03:23:42","guid":{"rendered":"https:\/\/matsuo.xiniuyunke.com\/en\/?post_type=case&#038;p=269"},"modified":"2026-09-29T11:23:42","modified_gmt":"2026-09-29T03:23:42","slug":"bhp-dragline-base-project-australia","status":"publish","type":"case","link":"https:\/\/www.matsuo.com.cn\/en\/case\/bhp-dragline-base-project-australia\/","title":{"rendered":"BHP Dragline Base Project, Australia"},"content":{"rendered":"<p>Location: Australia<br \/>\nClient: BHP Billiton<br \/>\nSteel Tonnage: 506 tonnes<br \/>\nStandards: AS\/NZS standards; main structural steel to GB standards<\/p>\n<p>The dragline base is a critical structural component of large-scale mining equipment, with demanding requirements for material strength, dimensional accuracy, welding quality and structural stability.<\/p>\n<p>Shanghai Matsuo first delivered the project successfully in 2016. A further order was awarded in 2020 and completed in 2021, reflecting continued customer confidence in our fabrication and delivery capabilities.<\/p>\n<p>The project marked an important step in Shanghai Matsuo\u2019s expansion into higher-value mining equipment structures and strengthened our experience in the Australian mining market.<\/p>\n","protected":false},"featured_media":270,"template":"","class_list":["post-269","case","type-case","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/www.matsuo.com.cn\/en\/wp-json\/wp\/v2\/case\/269","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.matsuo.com.cn\/en\/wp-json\/wp\/v2\/case"}],"about":[{"href":"https:\/\/www.matsuo.com.cn\/en\/wp-json\/wp\/v2\/types\/case"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.matsuo.com.cn\/en\/wp-json\/wp\/v2\/media\/270"}],"wp:attachment":[{"href":"https:\/\/www.matsuo.com.cn\/en\/wp-json\/wp\/v2\/media?parent=269"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}